Back
Back
Flood events in the Tyrolean uplands
Evaluation of observed flood events in the Inn River catchment
The Tyrolean Hydropower Operator TIWAG is running several hydropower plants in the headwater catchments of the Tyrolean Inn River. This project aims at analyzing the magnitude and the spatial extent of observed flood events at 19 river gauging stations. The study contributes to a better understanding of past flood situations and allows conclusion with regard to hydropower operations focusing of sediment transportation and flood volumes.
Status:
completed
Period:
08/2019 - 10/2019
Region:
Austria
Tyrol
Department:
Water & Climate
Customer:
Contact: